Zadix Flow runs selected, versioned checks relevant to EU Regulation (EU) 2024/573. AI helps extract data; users review the record and applicable legal requirements.
EU Regulation 2024/573 entered into force on 11 March 2024, replacing Regulation 517/2014. It sets requirements for containment, recovery and records across EU member states.
Key obligations for HVAC operators and service companies:
Leak checks depend on gas category, charge and equipment type (Art. 5).
After repair, applicable equipment needs an effectiveness check after 24 operating hours and within one month; mobile equipment has an exception (Art. 4(5)).
Equipment subject to leak checks needs records of gas, work, personnel and results (Art. 7).
Certified technicians and companies required for all F-Gas work (Art. 5)
Applicable records must be available to authorities on request and retained for at least five years (Art. 7(2)).
Article 4(5)
Follow-up after leak repair
For equipment subject to leak checks, a certified person must verify a leak repair after at least 24 operating hours and within one month. Article 4(5) permits an immediate check for specified mobile equipment.
Article 5
Leak check intervals by CO₂e tier
Article 5 sets check intervals by Annex I CO₂-equivalent charge or Annex II Section 1 kilograms, with specific equipment exemptions and detection-system intervals.
Article 7
Record-keeping requirements
Article 7 specifies the equipment records required when leak checks apply, including gas movements, facility details where relevant, personnel, check results and repair results.
Architecture
AI extracts. Code decides.
AI — What it does
Reads equipment label photos with GPT-4o vision
Transcribes voice notes via Whisper
Extracts: equipment type, serial, refrigerant type, amounts, leak status
Assigns confidence scores to each extracted field
Generates 3-line review summary for technician confirmation
Falls back to structured template if extraction fails
Compliance engine — What it does
Runs configured checks against service events
Versioned checks relevant to EU 2024/573
Each rule traceable to a specific regulation article
Versioned per country (DE/NL/GB independently)
Produces compliance_flags[] with severity + suggested fix
AI never sees or overrides rule output — completely separate pipeline
The Rules
The checks shown in this guide
These checks are implemented in code and documented for review. They do not cover every legal obligation.
ERRORErrors — record cannot be finalized
FGAS-01Art. 7
Refrigerant type required
Triggered when any refrigerant is added or removed. Refrigerant type must be specified.
FGAS-02Art. 7
Recovery cylinder ID required
Triggered on disposal or decommission. Recovery cylinder ID must be recorded when refrigerant is removed.
FGAS-04Art. 7
Serial number required for disposal
Equipment serial number or unique identifier is mandatory when action type is disposal or decommission.
FGAS-05Art. 7(1)
Refrigerant source required
When refrigerant is added, its source must be declared: virgin, recycled, or reclaimed.
FGAS-06Art. 7(1)
Reclamation facility required
If source is reclaimed, the name of the reclamation facility must be recorded.
FGAS-07Art. 7(1)(g)
Recovered gas destination required
When refrigerant is removed, its destination must be declared: recycled, reclaimed, or destroyed.
FGAS-08Art. 5
Technician certificate required
F-Gas certificate number of the performing technician must be attached to every service record, no exceptions.
FGAS-09Art. 5
Company certificate required
Service company F-Gas certificate number must be attached to every service record.
WARNINGWarnings — record can finalize with office review
FGAS-03Art. 7
Recovery amount consistency
If refrigerant is removed, recovered amount must be recorded. Missing value may indicate unrecovered atmospheric release.
FGAS-11Art. 5
Leak check — 5–50 tCO₂e tier
Equipment in the 5–<50 tonne CO₂e tier requires leak checks every 12 months (24 with certified detection system).
FGAS-12Art. 5
Leak check — 50–500 tCO₂e tier
Equipment in the 50–<500 tonne CO₂e tier requires leak checks every 6 months (12 with certified detection system).
FGAS-13Art. 5
Leak check — ≥500 tCO₂e tier
Equipment at or above 500 tonne CO₂e requires leak checks every 3 months (6 with certified detection system).
INFOInformational — auto-action triggered
FGAS-10Art. 4(5)
Follow-up after leak repair
Where Article 4(5) applies, a certified person checks repair effectiveness after 24 operating hours and within one month, subject to the mobile-equipment exception.
Reference Data
GWP reference table (built-in)
CO₂-equivalent = system charge (kg) × GWP ÷ 1,000. Used to determine leak check tier automatically.
R32
GWP 675
R410A
GWP 2088
R134a
GWP 1430
R404A
GWP 3922
R407C
GWP 1774
R22
GWP 1810
R290
GWP 3
R744
GWP 1
R507A
GWP 3985
R448A
GWP 1387
R449A
GWP 1397
R452A
GWP 2141
R454B
GWP 466
R513A
GWP 631
R1234yf
GWP <1
Data & Privacy
Your data. Your control.
🇩🇪
Hosting and integrations
The service is self-hosted. Some integrations process data with third-party providers; see the privacy notice.
🔒
Multi-Tenant Isolation
Every record has company_id. CompanyScopeGuard enforces isolation. PostgreSQL Row Level Security as second layer.
📋
Privacy documentation
See our privacy notice and request the current processing and transfer details.
🔑
SHA-256 Tamper-Proof
Finalized records sealed with SHA-256 hash. Immutable PostgreSQL trigger prevents modification at database level.
📤
Data Portability
Full CSV and PDF export available at any time, including 90 days after cancellation.
🕵️
Audit Trail
An audit log helps trace views, overrides and status changes. Article 7 records must be retained for at least five years where applicable.
See the rules in action
Crea un account. Invia una foto su WhatsApp. Guarda il motore di conformità valutarla in tempo reale.