Set up Zadix Flow in under 20 minutes

This guide walks you through every step from creating your account to recording your first F-Gas service event. You don't need to be a technical wizard — just follow the steps in order and you'll be ready to go.

Create Your Account

Head to the signup page and create your workspace. You'll be the account owner, which means you get full access to everything — settings, billing, users, and all service data. It only takes a minute.

app.zadixflow.com/signup
Zadix Flow

Create your account

Create your account to get started.

Kälte & Klima GmbH
Erik Bergström
••••••••••••

See our privacy notice for how integrations process data.

Company Name

This becomes your workspace name and appears on all PDF reports. You can update it later in Settings.

Your Role

You'll automatically be the account owner with full access — the only person who can manage billing and delete the account.

Set Up Your Company

After signup you'll land on the company settings page. Fill in your legal details before you do anything else — these appear on every compliance document you generate and are checked against EU F-Gas regulations.

app.zadixflow.com/settings?tab=company

Company Settings

Legal details used on compliance reports

Kälte & Klima GmbH
DE 812 345 678
🇩🇪 Germany (DE)

Also available: NL, GB, FR, IT

DE-KK-2024-00183
Industriestraße 14, 80339 München
Saved

Country Code

Determines which F-Gas compliance rules apply to you. Germany uses BImSchV, Netherlands uses STEK, UK uses F-Gas GB — the engine handles all of them automatically.

Certificate Number

Your F-Gas service company certificate is required for legal compliance. It appears on all generated reports and is validated against the EU 2024/573 format.

Invite Your Team

Zadix Flow is built around a team model. Your field technicians capture service data on mobile or WhatsApp; your office staff validate and finalize records; admins handle the operational side. Invite everyone before you go live.

app.zadixflow.com/team

Team Members

NameEmailRoleStatus
EB
Erik Bergström (you)
[email protected]OwnerActive
AM
Anna Müller
[email protected]AdminActive
TB
Thomas Bauer
[email protected]TechnicianInvite sent

Invite a new member

Full name
Technician

Admin / Office / Technician

Roles

Technicians capture data in the field via mobile or WhatsApp. Office staff validate events and generate reports. Admins manage everything except billing.

Invite by Email

Team members receive an email with a secure sign-in link. They set their own password on first login — you never need to share credentials.

Register Equipment

Every service event in Zadix Flow is linked to a piece of equipment. Register your HVAC units before your technicians go into the field — or let them scan QR codes to auto-create equipment on the spot.

app.zadixflow.com/equipment/new

Register Equipment

Add a unit to your asset registry

DK-2024-88431
Split AC

Split AC · Chiller · Heat Pump · VRF

Daikin Europe N.V.
2022-04-15

Refrigerant Details

R-410A
3.20
2,088
6.68 t

Refrigerant & Charge

The refrigerant type and total charge determine CO₂-equivalent mass. EU 2024/573 mandates leak checks based on CO₂-eq thresholds (5 t, 50 t, 500 t) — the system tracks this for you.

GWP Auto-Calculation

Global Warming Potential is looked up automatically from the refrigerant type — no manual data entry needed. R-410A is 2,088; R-32 is 675; R-290 (propane) is 3.

Your First Service Event

Now the real workflow begins. A technician captures a service event via WhatsApp or mobile app, the AI extracts structured data, and the compliance engine evaluates it against selected EU F-Gas checks.

app.zadixflow.com/events/new

Service Event Lifecycle

Draft
AI Extracted
Confirmed
Validated
Finalized
#EVT-2024-0041Draft
2 min ago

Action Type

Refill

Equipment

DK-2024-88431

Technician

Thomas Bauer

Refrigerant Added

0.45 kg R-410A

Leak Found

Yes — repaired

Compliance

13/13 passed
AI extracted · review before confirming

Lifecycle

Every service event flows through 5 stages: Draft → AI Extracted → Confirmed → Validated → Finalized. There are no shortcuts — this ensures data integrity at every step.

Compliance Check

The rule engine evaluates 13 EU F-Gas rules at each lifecycle transition — things like whether a leak was reported within 24 hours, whether the technician holds a valid certificate, and whether the CO₂-eq threshold triggers an audit.

Finalized = Sealed

Once finalized, the record receives a SHA-256 hash computed from all its fields. Any tampering would invalidate the hash — making the record legally defensible and audit-ready.

What's Next

Now that your account is set up, your team is invited, and your equipment is registered, you're ready to start working. Pick the guide that matches your role.