EU F-Gas compliance, fully automated

Zadix Flow runs configured checks relevant to EU Regulation 2024/573 on service events. This guide explains the engine, the checks it runs, and the supporting records and reports.

How the Engine Works

Zadix Flow's compliance engine is 100% deterministic code — AI never makes compliance decisions. AI extracts structured data from your photos and voice notes. Then hardcoded rules evaluate every field against EU 2024/573 regulation requirements. The result is a compliance status that is always reproducible and auditable.

Step 1
AI Extracts
GPT-4o reads photos, voice notes, and text. Outputs structured JSON.
↓
Step 2
Code Checks Rules
The deterministic engine runs configured checks against extracted fields.
↓
Step 3
Status Assigned
Compliance status and flags are written to the record instantly.
The compliance engine runs on every save — draft, confirmation, and validation stages all trigger a fresh evaluation.

Service Event Lifecycle

Every service event moves through a defined lifecycle from creation to immutable finalization. Each stage triggers a compliance re-evaluation. The record can only move forward — reversing a finalized record is not possible.

Draft
→
AI Extracted
→
Confirmed
→
Validated
→
Finalized
Draft

Record created but not yet submitted. Fields may be incomplete.

AI Extracted

AI has processed attached photos/voice notes and extracted structured data.

Confirmed

Technician has reviewed and confirmed the extracted data is accurate.

Validated

Office staff have validated the event against compliance rules.

Finalized

Owner has finalized the record. Immutable — no further edits possible.

Configured F-Gas checks

The listed checks are implemented in code and versioned. Their results assist review but do not establish complete legal compliance.

#RuleSeverity
01Refrigerant type required

Any refrigerant add/remove event must specify the refrigerant type.

ERROR
02Recovery cylinder ID required for disposal

Disposal or decommission events must record the recovery cylinder ID.

ERROR
03Recovery amount must be recorded

When refrigerant is removed, the recovered quantity must be documented.

ERROR
04Serial number required for disposal

Equipment serial number is mandatory for disposal or decommission actions.

ERROR
05Refrigerant source required when adding

When refrigerant is added, its source (virgin/recycled/reclaimed) must be declared.

ERROR
06Reclamation facility required for reclaimed source

If source is reclaimed, the reclamation facility name must be recorded.

ERROR
07Recovered gas destination required

When refrigerant is removed, its destination (recycled/reclaimed/destroyed) must be declared.

ERROR
08Technician F-Gas certificate required

F-Gas certificate number of the performing technician must be attached to every record.

ERROR
09Service company certificate required

The service company F-Gas certificate must be attached to every service record.

ERROR
10Follow-up after leak repair

Where Article 4(5) applies, the repair must be checked after 24 operating hours and within one month; specified mobile equipment may be checked immediately.

WARNING
11Leak check — 5–50 tCO₂e tier

Equipment in the 5–50 tonne CO₂e band requires a leak check every 12 months.

WARNING
12Leak check — 50–500 tCO₂e tier

Equipment in the 50–500 tonne CO₂e band requires a leak check every 6 months.

WARNING
13Leak check — >500 tCO₂e tier

Equipment above 500 tonne CO₂e requires a leak check every 3 months.

WARNING

Rules 1–9 are hard ERROR violations. Rules 10–13 are WARNING-level flags. All rules are versioned in source control alongside regulation citations.

Compliance Statuses

Every service event carries a compliance status. The engine recalculates the status automatically on each save. Understanding what each status means helps you prioritize which events need attention.

Pending

Incomplete data, awaiting more input from the technician or AI.

Valid

The configured checks passed. Review the record and applicable legal requirements.

Incomplete

One or more required fields are missing. Action needed before finalization.

Risky

Warnings present — no hard violations, but follow-up is recommended.

Non-Compliant

One or more rule violations detected. Must be resolved before finalization.

Not Evaluable

Insufficient context to evaluate compliance. Typically missing action type.

Compliance Flags

When a rule is violated, a compliance flag is raised. Flags carry a severity level, the specific regulation article, and the date of detection. All unresolved flags are surfaced in the dashboard for the office team to action.

app.zadixflow.eu/compliance/flags
4 unresolved flags2 Critical · 1 High · 1 Medium · 1 Low
Last scan: today 09:12
FGAS-001Critical2026-04-02
Service performed by uncertified technician — Jan P. cert expired 2026-01-15
Rule: EU 2024/573 Art. 11
FGAS-007High2026-04-01
Refrigerant quantity exceeds threshold without leak detection report attached
Rule: EU 2024/573 Art. 5
FGAS-014Medium2026-03-31
Equipment SV-0029 missing mandatory recovery record for R-410A
Rule: EU 2024/573 Art. 8
FGAS-022Low2026-03-28
Annual leak check overdue by 12 days for unit CHR-3312-K
Rule: EU 2024/573 Annex II

Evidence Scoring

Each service event receives an evidence score from 0 to 10. The score reflects how well-documented the event is — not whether it is compliant. A high evidence score makes audits significantly smoother and strengthens your position in case of regulatory inspection.

Evidence Score0 — 10
0–5 Weak6–7 Moderate8–9 Strong · 10 Verified
Evidence signalPoints
Photo attached+3
Voice note attached+2
GPS coordinates+2
Timestamp plausibility+1
AI confidence above threshold+1
Technician profile complete+1

Leak Check Tiers

EU Regulation 2024/573 mandates periodic leak checks based on the CO₂-equivalent charge of the equipment. Zadix Flow automatically tracks each unit's charge and alerts you when a check is overdue.

CO₂ EquivalentCheck Frequency
5–50 t CO₂eEvery 12 months
50–500 t CO₂eEvery 6 months
>500 t CO₂eEvery 3 months

Frequencies halve when a certified automatic leak detection system is installed (e.g. 50–500 t tier becomes every 12 months).

Country-Specific Rules

Beyond EU-wide rules, many member states have additional national requirements for F-Gas reporting. Zadix Flow is aware of these jurisdictions and surfaces the relevant requirements based on your company's registered country.

🇮🇹Italy

ISPRA F-Gas portal reporting required for operators

🇪🇸Spain

Registro Nacional de Emisiones reporting mandatory

🇫🇷France

Fiche d'intervention + BSDD waste tracking required

🇸🇪Sweden

Naturvårdsverket EPA reporting for operators

🇩🇰Denmark

HFC tax documentation required for refrigerant purchases

🇬🇧UK

F-Gas Register submission for operators and technicians

🇧🇪Belgium

Regional certification requirements vary by region

🇵🇱Poland

CRO (Central Register of Operators) reporting required

National and UK rules may add or differ from EU requirements. Review them separately.

Immutable Records

Once finalized, a record can never be modified — not even by an admin. This is enforced at the database level with a PostgreSQL trigger that blocks any UPDATE or DELETE on finalized records. A SHA-256 hash of the record content is stored at finalization time.

SV-2026-04-0042
Finalized
Finalized at2026-04-03 14:22:07 UTC
Finalized byErik Bergström (owner)
SHA-256 record hash
a3f8c2d1e4b9071f6a2d8c4e1b7f03a2c9d4e8b1f2a7c3e0d9b6f4a1c8e2d5b

PostgreSQL trigger

A BEFORE UPDATE OR DELETE trigger on the service_events table raises an exception if status = finalized.

SHA-256 hash

A hash of all record fields is stored at finalization. Any tampering at the database level is detectable by re-hashing the record.

PDF Certificates

Every finalized service event can be exported as a signed PDF certificate. The certificate includes all field data, the compliance status, technician and company certificates, and the SHA-256 record hash — suitable for regulatory submission or customer delivery.

app.zadixflow.eu/reports
Date From
2026-01-01
Date To
2026-03-31
Action Type
All types▾
Technician
All technicians▾
Format
PDF Report▾
PDF
Q1 2026 Compliance PDF
2026-04-01 · 284 KB
CSV
March Service Events CSV
2026-03-15 · 18 KB
PDF
February Compliance PDF
2026-02-28 · 261 KB

Annual Reports

Zadix Flow generates annual F-Gas compliance reports suitable for submission to national regulators. Reports can be scoped by date range, technician, equipment, or action type, and exported as PDF or CSV.

Annual report includes:

  • Total refrigerant added and recovered per equipment unit, aggregated by refrigerant type and GWP
  • All compliance flags raised during the period, with resolution status and responsible party
  • Technician certification status at time of each service event
  • Leak check schedule adherence — all overdue checks flagged with days overdue
  • Equipment with non-compliant or incomplete records, listed with event references

Equipment Logbook

EU 2024/573 requires operators to maintain a logbook for each refrigerant-containing system above 5 tCO₂e. Zadix Flow maintains this automatically — every service event is appended to the relevant equipment's logbook in chronological order. The logbook is exportable as a PDF at any time, pre-formatted to match the EU standard logbook template. Field snapshots are taken at event creation so the logbook reflects the equipment's state at the time of service, even if asset data changes later.

Refrigerant Balance

The refrigerant balance view gives you a running total of every refrigerant purchased, added to equipment, recovered, and destroyed — by refrigerant type and period. This is the data you need for annual reporting to national regulators and for tracking your company's total F-Gas use against quota limits. Discrepancies between purchased and recorded quantities are automatically flagged as potential unrecorded releases.

Risk Overview

The risk overview on the main Dashboard aggregates all open compliance issues into an estimated fine exposure figure, calculated against the EU 2024/573 penalty schedule. Use it to prioritize your team's attention and demonstrate to your clients that compliance is proactively managed.

app.zadixflow.eu/dashboard
€12,500
Based on EU 2024/573 penalty schedule · Updated today at 09:12
1tech
Uncertified Technicians
Est. exposure
€4,250
Jan P. — cert expired 2026-01-15
2units
Overdue Equipment
Est. exposure
€3,875
RT-9901-BX · AC-4450-TQ
3events
Non-Compliant Events
Est. exposure
€4,375
SV-0028 · SV-0026 · SV-0021

Escalation Timeline

Unresolved events follow an automatic escalation path. The system monitors each event from the moment the technician confirms, and escalates through reminders, dashboard flags, and risk promotions until the record is finalized.

Day 0Tech confirms

Technician reviews AI extraction and confirms the service event data is accurate.

Day 1Office validates

Office staff checks the event against compliance rules and validates completeness.

Day 2Owner finalizes

Account owner reviews and finalizes the record. It becomes immutable at this point.

Day 7Marked stale

If still unfinalized after 7 days, the event is flagged as stale in the dashboard.

Day 10WhatsApp escalation

An automated WhatsApp reminder is sent to the responsible team member.

Day 20Unresolved risk

Event is promoted to the main Dashboard as an open compliance exposure item.

Escalation timelines can be customized per workspace in Settings → Notifications. WhatsApp escalations require Twilio integration to be configured.